Looking down on dump truck
with portable bridge in the back. Note the old concrete bunker between the
river and the truck.
The
river under the bridge was a great swimming hole. The water was 15 to 20
feet deep and was cool and refreshing. Marines
are 11th Engineers preparing to get to work setting up the bridge.
|